Private Residence: In Progress 5

The final touches have been added to our latest private residence project.

_J3A8033View from the street. The black-stained cedar upper form cantilevers over the stone base.

_J3A8107-PanoramaThe north side of the house opens up to a large roof garden and pool with infinity edge. A covered and heated area provides outdoor living space.

_J3A8138Sliding doors fully open the living area to the outdoor space.

_J3A7963-PanoramaA steel and walnut staircase connects the atrium space to the upper floor bedrooms.

_J3A7992-PanoramaA steel and walnut staircase connects the atrium space to the upper floor bedrooms.

_J3A8206-PanoramaDetails of the wine room.

Images courtesy of CE Miles Construction Ltd. and Ema Peter Photography

THNK Vancouver Nearing Completion.

Our current project for THNK: School Of Creative Leadership is nearing completion. Final millwork & acoustic installs, along with painting are all moving along, and set for a new year’s opening.

Private Residence: In Progress 4

A quick update with a few images as construction continues on the Point Grey Residence.

andrews_IMG_3114

andrews_IMG_3113

andrews_IMG_3105

andrews_IMG_3107

andrews_IMG_3111

Private Residence: In Progress 3

The steel stair guards have been installed at our latest Point Grey house.

evk_and_11″ thick steel plate has been powder coated white. The steel tread supports are awaiting a solid wood finish.

evk_and_2

evk_and_3 evk_and_4

New Restaurant on Robson Street

Our latest restaurant project, located in the former O’Doul’s on Robson Street, is nearing completion and set to open to the public next week.

To get a peak inside the construction, and the evolution, of the restaurant, visit The Next Course.

Image

Image

PRESS: Western Living – Powder Play

Our recently completed Whistler residential project for Trevor Linden is featured in the latest issue of Western Living’s CONDO magazine.

All photos: Janis Nicolay Photography

Private Residence: In Progress 2

Structural steel is up and framing is well underway. These are the largest wall trusses we have ever used! (design courtesy of WHM structural engineers).

Laneway House

After a lengthy permit process, our first laneway house is under construction. Compact but efficient, the project contains 500 square feet of living in addition to the single car garage.

Private Residence: In Progress 1

The foundation walls are poured at our latest Point Grey house. It’s difficult to tell by the pictures, but the forms are massive!

Next up: suspended slab podium with infinity pool.

West 9th House

The second West 9th Avenue house is moving along well. The exterior envelope is just about complete, with the cement board and custom aluminum trim flashing installed. The limestone tile has been installed in the ensuite shower room.

%d bloggers like this: